STORM DRAINAGE & DETENTION SYSTEMS
Our experience includes design and construction phase services for storm water conveyance systems (to include open ditch and underground storm water conveyance system up to 60-inch) and detention facilities. Our experience also includes maintenance and repair of existing drainage and storm water detention facilities.
Harris County Flood Control District: Erosion Repairs to K143-00-00-X009
Rehabilitation of approximately 3,700 linear feet of the K143-00-00-X009 from Grant Road to Cypresswood Drive in the NW Harris County. Project involved the re-establishment of the flow line, erosion repairs, slope stabilization, repair and replacement of storm water outfall structures, and repair of back slope drains. The project also required the coordination with HCFCD and adjacent Utility Districts for the installation of a walking trail.
Client: Harris County Flood Control District
Project Manager: Dennis Sander, P.E.
Project Location: Houston, TX
Project Cost: $666,555
Harris County MUD 173
Harris County MUD No. 173 is responsible for large detention pond within the District that had become overgrown and blockages prevented flow downstream of the pond. The project involved reconstruction of portions of the pond, regrading of the outfall ditch, erosion control measures, and landscape improvements. Coordination was required with Harris County Flood Control District and the neighboring utility district that shared responsibility for the pond and ditch.
Client: HCMUD 173
Project Manager: Erik Miller, P.E.
Project Location: Houston, TX
Project Cost: $300,000