Evaluation and rehabilitation of the City’s lift stations. To date, 41 lift stations have been rehabilitated. The lift station sizes vary from small two (2) pump stations to major multi pump installations. Rehabilitation typically consists of replacement of the pumps, piping, structural modifications and electrical controls, landscaping and site improvements.
Client: Sugar Land, Texas
Project Manager: Erik Miller, P.E.
Project Location: Fort Bend County, TX
Design Engineer: Bill Manning, Jr., P.E.
Project Cost: $2,000,000+