Harris County MUD No. 173 is responsible for large detention pond within the District that had become overgrown and blockages prevented flow downstream of the pond. The project involved reconstruction of portions of the pond, regrading of the outfall ditch, erosion control measures, and landscape improvements. Coordination was required with Harris County Flood Control District and the neighboring utility district that shared responsibility for the pond and ditch.
Client: HCMUD 173
Project Manager: Erik Miller, P.E.
Project Location: Houston, TX
Project Cost: $300,000