The improvements to Porter Road include preliminary and design phase services for the reconstruction of an existing two-lane asphalt roadway section with open ditches to a concrete curb and gutter boulevard section, including road design, paving, transitions, and drainage facilities. The approximate length of the project is 0.5 miles. SEC was responsible for the preparation of the drainage analysis for the storm water outfall into Mason Creek Park, preparation of a Storm Water Pollution Prevention Plan, preparation of a Storm Water Quality Management Plan, coordination with subcontractors for surveying, geotechnical and environmental services, and coordination design and construction with adjacent projects.
Client: Harris County
Project Manager: Dennis Sander, P.E.
Project Location: Harris County, TX
Project Cost: $2,500,000