Rehabilitation of approximately 3,700 linear feet of the K143-00-00-X009 from Grant Road to Cypresswood Drive in the NW Harris County. Project involved the re-establishment of the flow line, erosion repairs, slope stabilization, repair and replacement of storm water outfall structures, and repair of back slope drains. The project also required the coordination with HCFCD and adjacent Utility Districts for the installation of a walking trail.
Client: Harris County Flood Control District
Project Manager: Dennis Sander, P.E.
Project Location: Houston, TX
Project Cost: $666,555